Here is another demonstration of Chemglass's ability to utilise materials other than GRP on large scale projects.

In this particular case we were asked by a client to provide a cover of some description for a 25m diameter storage tank, which was previously open to the elements. The solution was to create a steel framework with a plastic sheeting cover.

Once manufactured, the bespoke covering was added on site before the completed structure was lifted into place using the included lifting eyes and secured on the tank.

Frame On Site

Cover Being Added

Hoisting Into Place

Almost There

Finished